INVITATION TO BID

INVITATION TO BID: KIEWIT
INFRASTUCTURE WEST CO. US 26:
CORNELIUS PASS RD – NW 185TH AVE SEC SUNSET HIGHWAY
WASHINGTON COUNTY, OR
Bids due: August 30, 2016 @ 4:00 pm
Kiewit is soliciting subcontractor bids and material quotes from subcontractors and suppliers, including qualified DBEs (Disadvantaged Business Enterprise) certified by the Certification Office of Business Inclusion and Diversity (COBID), for the following project:
US 26: Cornelius Pass Rd – NW
185th Ave Sec Sunset Highway Owner:
Oregon Department of Transportation
Bid Date: September 1, 2016
@ 9:00 AM (PDT)
Quotes Due by: August 30, 2016
@ 4:00 PM (PDT)
KIEWIT INFRASTRUCTURE WEST CO.
2200 Columbia House Blvd
Vancouver, WA 98661 PH: (360) 693-1478 FAX: (360) 693-5582
Email: NW.Estimating@Kiewit.com
This Federal-Aid project will consist of the following: Widen approximately 2 miles of US26 from NW 185th Ave. to NW Cornelius Pass Rd. Major Improvements include increasing the east and west-bound lanes from two to three, replacing the two Rock Creek bridges, with a single combined span, constructing a sound wall, constructing new storm-water treatment facilities and improving the ramps at both interchanges. Also included are constructing a new sign bridge, relocating a VMS Sign and all incidental work.
Plans and specifications can be accessed from ODOT’s website: https://ecm.odot. state.or.us/cf/EBIDS/
Services and supplies being solicited include: Aggregates; Asphalt Concrete Pavement; Cable Barrier; Demolition of Structures; Drilled Shafts; Drainage, Culvert, Ductile Iron, and Storm Sewer Pipe; Electrical, Lighting, ITS; Erosion and Sediment Control; Equipment Rental; Fencing; Flagging and Temporary Protection and Direction of Traffic; Geotextiles, Geogrids and Liners; Guardrail; Haul (truck); Horizontal Drilling; Jack & Boring; Landscape and Seeding; Masonry, Misc. Metals; Overhead Signs; Pavement Markings; Pre-Cast Drainage Structures, Concrete Deck Panel, Concrete Girders, Sound Wall Panels; Ready-Mix Concrete; Rebar; Roadway Signs; Sawcutting, Steel Piles; Structural Concrete; Construction Survey; Water Treatment.
In order to assist certified Disadvantaged Business Enterprise Contractors and Suppliers, we will divide items of work into smaller tasks or quantities and establish delivery and construction schedules which will permit maximum participation of disadvantaged businesses where feasible.
All subcontractors and material suppliers are required to execute our standard “Subcontract Agreement” or “Material Contract”. We require 100% Performance and Payment, or Supply Bonds. If you have questions regarding these contract agreements, please contact us for a copy.
Numerical goals are established based on the availability of qualified applicants in the job market or qualified candidates in the employer’s work force. Executive Order [E.O. 11246] numerical goals do not create set-asides for specific groups, nor are they designed to achieve proportional representation or equal results. Rather, the goalsetting process in affirmative action planning is used to target and measure the effectiveness of affirmative action efforts to eradicate and prevent discrimination. The Executive Order and its supporting regulations do not authorize OFCCP to penalize contractors for not meeting goals. The regulations at 41 CFR 60-2.12(e), 60-2.30 and 60-2.15, specifically prohibit quota and preferential hiring and promotions under the guise of affirmative action numerical goals. In other words, discrimination in the selection decision is prohibited.
We are an Equal Opportunity Employer.
Published Aug. 19, 2016.
BT15856615