NOTICE OF APPLICATION

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

City of Portland Water Bureau            Project No. 6957-002

NOTICE OF APPLICATION ACCEPTED FOR FILING, SOLICITING COMMENTS, MOTIONS TO INTERVENE, AND PROTESTS

(October 23, 2014)

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a.   Types of Application:    Surrender of Exemption

b.   Project No.:         6957-002

c.   Date Filed:        October 3, 2014

d.   Applicant:        City of Portland Water Bureau

e.   Name of Project:    Mt. Tabor Hydroelectric Project

f.    Location:        Mt. Tabor Reservoir, in the City of
Portland and Multnomah County, Oregon

g.   Filed Pursuant to:    Federal Power Act, 16 USC 791a-825r.

h.   Applicant Contact:    Mr. Frank Galida, Portland
Hydroelectric Project Manager Portland Water Bureau, 1120 S.W. Fifth Avenue, Room 530, Portland, OR 97204, (503) 823-1517

i.    FERC Contact:    Ms. Rebecca Martin,
(202) 502-6012,
Rebecca.martin@ferc.gov

j.    Deadline for filing comments, motions to intervene, and protests, is November 23, 2014.  All documents may be filed electronically via the Internet.  See, 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site at http://www.ferc.gov/docs-filing/efiling.asp.  If unable to be filed electronically, documents may be paper-filed.  To paper-file, an original and seven copies should be mailed to: Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC  20426.  Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.  You must include your name and contact information at the end of your comments.

Please include the project number (P-6957-002) on any comments, motions, or recommendations filed.

k.   Description of Request:  The applicant proposes to surrender the exemption for the Mt. Tabor Project.  The licensee proposes to remove the turbine, generator, and governor.  The underground electrical connection to the local power utility would be disconnected.  No ground disturbing activities are proposed.

l.   Locations of the Application:  A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371.  This filing may also be viewed on the Commission’s website at http://www.ferc.gov/docs-filing/efiling.asp.  Enter the docket number excluding the last three digits in the docket number field to access the document.  You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.  For assistance, call 1-866-208- 3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659.  A copy is also available for inspection and reproduction at the address in item (h) above.

m.   Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission.

n.   Comments, Protests, or Motions to Intervene:  Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, 211, 214.  In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding.  Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o.   Filing and Service of Responsive Documents:  Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE”, as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005.  All comments, motions to intervene or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b).  All comments, motions to intervene or protests should relate to project works which are the subject of the license amendment.  Agencies may obtain copies of the application directly from the applicant.  A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.  If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.  A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Kimberly D. Bose,
Secretary.
Publish 11/13/2014.                  BVT8943

NOTICE OF APPLICATION

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

Portland General Electric Company            Project No. 2195-079

NOTICE OF APPLICATION ACCEPTED FOR FILING, SOLICITING MOTIONS TO INTERVENE, PROTESTS, AND COMMENTS

(August 27, 2012)

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a. Type of Application:  Amendment of License

b. Project No:  2195-079

c. Date Filed:  August 3, 2012

d. Applicant:  Portland General Electric Company

e. Name of Project:     Clackamas River Hydroelectric Project

f. Location:  On the Oak Grove Fork of the Clackamas River and the mainstem of the Clackamas River in Clackamas County, Oregon.  The project occupies federal lands within the Mt. Hood National Forest, under the jurisdiction of the U.S. Forest Service, and a reservation of the U.S. Department of Interior’s Bureau of Land Management.

g. Filed Pursuant to:  Federal Power Act, 16 USC 791(a) – 825(r)

h. Applicant Contact:  Julie A. Keil, Director of Hydro Licensing and Water Rights, Portland General Electric Company, 121 SW Salmon Street, Portland, OR  97204, (503) 464-8864.

i. FERC Contact:  Jeremy Jessup, (202) 502-6779, Jeremy.Jessup@ferc.gov.

j. Deadline for filing motions to intervene, protests, and comments is 30 days from the issuance date of this notice.

All documents may be filed electronically via the Internet.  See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission’s web site at http://www.ferc.gov/docs-filing/efiling.asp.  If unable to be filed electronically, documents may be paper-filed.  To paper-file, an original and seven copies should be mailed to:  The Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC  20426.  Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.  You must include your name and contact information at the end of your comments.

Please include the project number (P-2195-079) on any motions, protests, or comments filed.

k. Description of Application:  The licensee proposes to amend the license for the Clackamas River Hydroelectric Project to remove two transmission lines that are no longer primary transmission lines.  The licensee is requesting to delete the 17-mile Faraday-McLoughlin double-circuit transmission line and the 2.7-mile River Mill-Faraday transmission line from the project.  The license’s application states that both of the transmission lines function as part of the licensee’s transmission and distribution system and are not jurisdictional under Part 1 of the Federal Power Act.  The proposed amendment will reduce the amount of lands of the United States that the project occupies by 1.4 acres.

l. Locations of the Application:  A copy of the application is available for inspection and reproduction at the Commission’s Public Reference Room, located at 888 First Street, NE, Room 2A, Washington, DC 20426, or by calling (202) 502-8371.  This filing may also be viewed on the Commission’s website at http://www.ferc.gov/docs-filing/elibrary.asp.  Enter the docket number excluding the last three digits in the docket number field to access the document.  You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.  For assistance, call (866) 208- 3676 or e-mail FERCOnlineSupport@ferc.gov, for TTY, call (202) 502-8659.  A copy is also available for inspection and reproduction at the address in item (h) above.

m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission.

n. Motions to Intervene, Protests, and Comments:  Anyone may submit a motion to intervene, protest, or comments in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214.  In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding.  Any motions to intervene, protests, or comments must be received on or before the specified comment date for the particular application.

o. Filing and Service of Responsive Documents:  Any filing must:  (1) bear in all capital letters the title “MOTION TO INTERVENE,” “PROTEST,” or “COMMENTS” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person intervening, protesting, or commenting; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005.  All motions to intervene, protests, or comments must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b).  All motions to intervene, protests, or comments should relate to project works which are the subject of the application.  Agencies may obtain copies of the application directly from the applicant.  A copy of any motion to intervene or protest must be served upon each representative of the applicant specified in the particular application.  If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.  A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

Kimberly D. Bose,
Secretary.
Publish 09/05/2012.                                            CLK12653

NOTICE OF APPLICATION

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

City of Portland, Oregon         Project No. 2821-011

NOTICE OF APPLICATION FOR AMENDMENT OF LICENSE AND SOLICITING COMMENTS, MOTIONS TO INTERVENE, AND PROTESTS

(January 12, 2012)

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a:  Application Type:  Non-Capacity Amendment of License

b:  Project No.:  2821-011

c:  Date Filed:  June 27, 2011, and supplemented November 23, 2011, and January 11, 2012.

d:  Applicant:  City of Portland, Oregon

e:  Name of Project:  Portland Hydroelectric Project

f:  Location:  Approximately 25 miles east of the City of Portland, on the Bull Run River, in Multnomah and Clackamas Counties, Oregon.

g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r)

h:  Applicant Contact:  Frank Galida, Portland Hydroelectric Project Manager, Portland Water Bureau, City of Portland, Oregon, Room 530, 1120 SW 5th Avenue, Portland, OR 97204, (503) 823-7517, frank.galida@portlandoregon.gov.

i. FERC Contact: Christopher Chaney, (202) 502-6778, christopher.chaney@ferc.gov.

j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice.  All documents may be filed electronically via the Internet.  See 18 C.F.R. 385.2001(a)(1)(iii) and the instructions on the Commission’s website http://www.ferc.gov/docs-filing/efiling.asp.  Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.  You must include your name and contact information at the end of your comments.  For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659.  Although the Commission strongly encourages electronic filing, documents may also be paper-filed.  To paper-file, mail an original and seven copies to:  Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426.

The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project.  Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

k. Description of proposed amendment:  The licensee proposes to modify the North Tower intake at the Dam No. 2 Development of the Portland Project.  A multi-level intake structure would be added to the tower to allow for the selective withdrawal of water from different reservoir elevations.  The modifications are necessary to allow for better temperature management below Dam No. 2, as required by the Bull Run Water Supply Habitat Conservation Plan (HCP).  Environmental impacts related to selective water withdrawal were already analyzed as part of the HCP.  Neither the hydraulic capacity nor the installed capacity would change as a result of the modifications, and there would be no change in project operation or normal reservoir elevations.

l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at http://www.ferc.gov using the “eLibrary” link.  Enter the docket number excluding the last three digits in the docket number field to access the document.  For assistance, contact FERC Online Support.  A copy is also available for inspection and reproduction at the address in item h above.

You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.  For assistance, contact FERC Online Support.

m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission.

n. Comments, Protests, or Motions to Intervene:  Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214.  In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding.  Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o.  Filing and Service of Responsive Documents:  Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005.  All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b).  Agencies may obtain copies of the application directly from the applicant.  A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.  If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.  A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.
Kimberly D. Bose,
Secretary
Publish 01/19/2012.                VT8434

NOTICE OF APPLICATION

UNITED STATES OF AMERICA
FEDERAL ENERGY REGULATORY COMMISSION

City of Portland, Oregon                                Project No. 2821-011

NOTICE OF APPLICATION FOR AMENDMENT OF LICENSE AND SOLICITING COMMENTS, MOTIONS TO INTERVENE, AND PROTESTS

(January 12, 2012)

Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection:

a:  Application Type:  Non-Capacity Amendment of License

b:  Project No.:  2821-011

c:  Date Filed:  June 27, 2011, and supplemented November 23, 2011, and January 11, 2012.

d:  Applicant:  City of Portland, Oregon

e:  Name of Project:  Portland Hydroelectric Project

f:  Location:  Approximately 25 miles east of the City of Portland, on the Bull Run River, in Multnomah and Clackamas Counties, Oregon.

g. Filed Pursuant to: Federal Power Act, 16 USC 791(a)-825(r)

h:  Applicant Contact:  Frank Galida, Portland Hydroelectric Project Manager, Portland Water Bureau, City of Portland, Oregon, Room 530, 1120 SW 5th Avenue, Portland, OR 97204, (503) 823-7517, frank.galida@portlandoregon.gov.

i. FERC Contact: Christopher Chaney, (202) 502-6778, christopher.chaney@ferc.gov.

j. Deadline for filing comments, motions to intervene, and protests is 30 days from the issuance date of this notice.  All documents may be filed electronically via the Internet.  See 18 C.F.R. 385.2001(a)(1)(iii) and the instructions on the Commission’s website http://www.ferc.gov/docs-filing/efiling.asp.  Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp.  You must include your name and contact information at the end of your comments.  For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll free at 1-866-208-3676, or for TTY, (202) 502-8659.  Although the Commission strongly encourages electronic filing, documents may also be paper-filed.  To paper-file, mail an original and seven copies to:  Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE, Washington, DC 20426.

The Commission’s Rules of Practice and Procedure require all intervenors filing documents with the Commission to serve a copy of that document on each person whose name appears on the official service list for the project.  Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.

k. Description of proposed amendment:  The licensee proposes to modify the North Tower intake at the Dam No. 2 Development of the Portland Project.  A multi-level intake structure would be added to the tower to allow for the selective withdrawal of water from different reservoir elevations.  The modifications are necessary to allow for better temperature management below Dam No. 2, as required by the Bull Run Water Supply Habitat Conservation Plan (HCP).  Environmental impacts related to selective water withdrawal were already analyzed as part of the HCP.  Neither the hydraulic capacity nor the installed capacity would change as a result of the modifications, and there would be no change in project operation or normal reservoir elevations.

l. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission’s website at http://www.ferc.gov using the “eLibrary” link.  Enter the docket number excluding the last three digits in the docket number field to access the document.  For assistance, contact FERC Online Support.  A copy is also available for inspection and reproduction at the address in item h above.

You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects.  For assistance, contact FERC Online Support.

m. Individuals desiring to be included on the Commission’s mailing list should so indicate by writing to the Secretary of the Commission.

n. Comments, Protests, or Motions to Intervene:  Anyone may submit comments, a protest, or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, .214.  In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission’s Rules may become a party to the proceeding.  Any comments, protests, or motions to intervene must be received on or before the specified comment date for the particular application.

o.  Filing and Service of Responsive Documents:  Any filing must (1) bear in all capital letters the title “COMMENTS”, “PROTEST”, or “MOTION TO INTERVENE” as applicable; (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005.  All comments, motions to intervene, or protests must set forth their evidentiary basis and otherwise comply with the requirements of 18 CFR 4.34(b).  Agencies may obtain copies of the application directly from the applicant.  A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.  If an intervener files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.  A copy of all other filings in reference to this application must be accompanied by proof of service on all persons listed in the service list prepared by the Commission in this proceeding, in accordance with 18 CFR 4.34(b) and 385.2010.

Kimberly D. Bose,
Secretary
Publish 01/18/2012.                    CLK12475