Boys & Girls Club Of Chehalis (BGCC)

INVITATION TO BID: BOYS & GIRLS CLUB OF CHEHALIS (BGCC) CHEHALIS, WA Bids due December 8, 2016 @ 4:00 pm Sealed proposals for furnishing all materials, labor and equipment for the following described work will be received by RB Engineering, 91 SW 13th Street (in person) or PO Box 923 (by mail), Chehalis, Washington 98532 up until 4:00 p.m. on Thursday, December 8th, 2016. At that time the sealed bids will be publicly opened and read. A contract will be awarded or all bids rejected within 60 days after the bid opening. PROJECT DESCRIPTION Work will include constructing a new 7,275 square foot two story BGCC facility. Contractor will be responsible for construction of the foundation, building, building perimeter concrete walks and drainage system elements associated with the roof and foundation installation and water, power and telecommunications building connections. Owner’s contractor will complete all other onsite and offsite improvements per the site construction plans. The issuing office for Contract Documents is RB Engineering, Inc., 91 SW 13th Street, PO Box 923, Chehalis, Washington 98532, telephone number (360) 740-8919. Contract Documents including drawings will be issued upon payment of non-refundable fee of $100.00 payable to RB Engineering for a CD and Full Size Set of Plans or $25 for just a CD of plans and specifications. Technical inquiries regarding the project should be directed in writing to the office of the Project Engineer, RB Engineering, Inc., 91 SW 13th Street, PO Box 923, Chehalis, Washington 98532, civilpros@rbengineers. com. All inquires must be emailed to RBE, no inquires will be addressed verbally. All Proposals must be submitted on the regular form furnished with the specifications. The Boys & Girls Club of Chehalis reserves the right to reject any or all bids, waive informalities, or to accept that bid which appears to serve the best interests of the BGCC. Published Nov. 29, 2016. BT15872112

ad: 15872112

Publication: Construction

Section: Bids

Start Date: 11/29/2016

End Date: 11/29/2016

Owner: RB Engineering