BARNEY RESERVOIR JOINT OWNERSHIP COMMISSION BARNEY RESERVOIR DAM SPILLWAY FENCE REPLACEMENT

CITY OF HILLSBORO BARNEY RESERVOIR JOINT OWNERSHIP COMMISSION BARNEY RESERVOIR DAM SPILLWAY FENCE REPLACEMENT Bid Closing Date and Time: June 14, 2019 @ 1:00 PM Pacific First Tier Subcontractor Disclosure due: Not later than June 14, 2019 @ 4:00 PM Pacific INVITATION TO BID (ITB) ITB NO. 2019-05-BARNEYFENCE The Barney Reservoir Joint Ownership Commission (BRJOC) seeks sealed bids from qualified firms able to provide all equipment, materials, and labor required to remove approximately 1,650 linear feet of chain link fence and fence posts embedded in the top of a concrete dam spillway structure, and replace approximately 1,650 linear feet (1,300 linear feet of 5-ft high fence and 350-ft of 7-ft high fence) of new galvanized chain link fence and posts at the Barney Reservoir Dam Spillway located off N Fork Trask Road, Yamhill, Oregon. Work to include the removal of existing fence posts where possible, removal of loose debris and water from existing fence post sockets, and backfill with epoxy resin mortar topped with an elastomeric polyurethane coating. Where fence post removal is infeasible, existing posts to be cut below top of wall, and the location backfilled with epoxy resin mortar and topped with an elastomeric polyurethane coating. New galvanized fence posts will require galvanized fence post mounting hardware (owner furnished) to be installed on the side of the concrete wall structure using 5/8 GR. 36 hot dip galvanized threaded rod

ad: 109338

Publication: Invitations To Bid

Section: Legals

Start Date: 2019/05/15

End Date: 2019/05/15

Owner: City of Hillsboro

City: HILLSBORO

County: Washington

Bid Date: 06/14/19

Bid Time: 1:00 PM